Owned infrastructure
We build and operate our own nodes — not resold third-party capacity.
JEVONS EDGE is building AI-ready edge data centres across ten Spanish tier-2 cities.
Reservations open July 1, 2026 — Zaragoza & MálagaEdge nodes across Spain
Paired backup regions
Per-rack density (DLC)
Latency for regional use cases
Time to market with power available
JEVONS EDGE is a Spanish operator building the country's first native edge-AI network — bringing GPU capacity and AI sovereign colocation closer to where data is created.
We design, build and operate our own AI-ready edge data centres across ten tier-2 cities, organised into five paired backup regions — delivering low-latency, in-country compute for enterprises, public bodies and AI teams that cannot depend on distant hyperscale hubs.
We build and operate our own nodes — not resold third-party capacity.
Ten tier-2 cities in five paired regions, with in-country sovereignty.
Modular, high-density nodes with Direct-to-Chip liquid cooling.
Inference and agentic workloads are exploding.
Latency is too high beyond Madrid and Barcelona — unworkable for real-time AI.
Little regional infrastructure is ready for next-generation, high-density GPUs.
Rising regulatory pressure demands control over where data and models are processed.
Enterprises need local continuity and recovery during regional outages.
JEVONS EDGE deploys smaller, modular nodes in tier-2 cities.
Proximity — sub-10 ms latency.
Power-pragmatic — up to 10 MW IT nodes.
Paired regions for replication and failover.
| Hyperscale | ||
|---|---|---|
| Location | Core hubs | Tier-2 cities |
| Latency to users | Regional | <10 ms |
| Power per site | 100+ MW | Up to 10 MW IT |
| Data sovereignty | ||
| Regional resilience |

JEVONS combines <10 ms in tier-2 cities, contractual sovereignty, H200/B300, DLC and BaaS/DRaaS.
If any of these sound familiar, we should talk.
Built for teams in
Answer to see your fit
150 kW racks cooled directly at the chip.
Four layers on owned infrastructure.
AI workloadinference request →
→ executed at the edge node
10 nodes · 5 regions
Click any layer — on the path or in the stack — to pin its details.
Higher ARPU per installed MW.
Today: colocation + on demand GPUaaS.
A possible later evolution.
Clear units, clear terms. Pick the model that fits your workload.
Dedicated H200 / B300 capacity for predictable inference and training.
€/GPU·h · 6–12 months
Bring your own accelerators into 100–150 kW Direct-to-Chip racks.
€/kW·month · 12–36 months
Reserved GPU hours and availability for agentic, always-on workloads.
Reserved kW/TB · recurring
| Product | For whom | Buying unit | Initial term |
|---|---|---|---|
| GPUaaS Reserved | BPO, AI, health, retail | €/GPU·h | 6–12 months |
| GPUaaS On-demand | Inference peaks | €/GPU·h | On-demand |
| AI-ready colocation | Clients with own hardware | €/kW·month | 12–36 months |
| DRaaS / BaaS (sovereign) | Regulated sectors | Reserved kW/TB | Recurring |
Compact footprint, industrialised engineering. A repeatable facility — 1,000 m² built on a 10,000 m² plot — designed for high-density AI from day one.
Scales within the same infrastructure as demand grows.
Direct-to-Chip liquid cooling for the densest workloads.
Ambient-cooled capacity for mixed, lighter workloads.
External power & pumping modules cut civil works and speed deployment.
In-country data with paired-region replication and failover.
Built for thermal efficiency, sustainability and schedule control.
Tier-2 cities paired into five regions.
Tap a node to explore the network
Eastern–Western Andalusia
Málaga · Seville
Levant / Ebro Valley
Valencia · Zaragoza
Basque Country – Cantabria
Bilbao · Santander
Asturias – Castile & León
Oviedo · Valladolid
Western Atlantic coast
Vigo · A Coruña
Production workloads need contractual commitments, not marketing promises.
AI edge infrastructure will be one of Europe's most strategic assets.
Low, predictable latency unlocks new workloads.
Real-time speech and conversational AI.
On-the-spot image and video inference.
Multi-step agent loops needing local latency.
Sub-second fraud detection and dynamic pricing.
The network grows region by region.
Launch the anchor offering.
Deploy the paired-city network across Spain.
Introduce the managed middle layer.
Scale node capacity as demand matures.
From July 1, 2026 we open reservations for the first 4 MW across Zaragoza and Málaga.
Indicative terms, subject to permits and final agreement.
Whether you need capacity now or you're backing the network, let's talk.
Reserve GPU capacity or plan a colocation deployment.
Request the teaser and explore the rollout.